Rapid Floor Systems
Floor Systems
Flooring by Rapid Floor
 Call Rapid Floor at 1-800-356-6720
Rapid Floor Systems By Maxxon:
A Flooring Reputation You Can Stand On!
Call Rapid Floor 763-478-9655

More Projects

90 West Street

Maxxon CSM

Project: 
90 West Street

Location: 
New York, NY

Applicator: 
New Floor Installers

Scope: 
Located directly across the street from the twin towers, this 23-story 1920's-era bulding was all but destroyed during the attack on the World Trade Center.  Now it is in the process of being reborn as luxury rentals in the heart of New York City's financial district.

New Floor Installers' Nick Patti, Jr. chose Maxxon's new Crack Suppression Mat, CSM, to help solve the challenge of installing Rapid Floor Plus on old, dry, and uneven tongue and groove wood floors.  The project was originally specified to have metal lath mechanically fastened to the wood substrate.  CSM was introduced as a practical, cost-saving, alternative to the labor intensive metal lath.

Total square footage of mat areas is over 65,000 square feet.


Holiday Inn Express Hotel and Suites

-Rapid Floor Plus

Academic Facility Vertical Expansion of Rush Hospital

-Rapid Floor Ultra

Market House Lofts

-Rapid Floor Plus

Barclay Square Apartments

-Rapid Floor Plus

Student Housing Project

-Rapid Radiant

Single Family House

-Rapid Radiant

 

 

 

entry.jpg (32528 bytes)

 


 

Home  |  Floor Products  |  Floor Product Selection Guide  |  Contact  |  About Rapid Floor

 

© 2006-2008 Maxxon - Rapid Floor Systems
Web Site Services by www.CATWIRED.com